Location: Columbia, South Carolina
Owner: South Carolina Electric & Gas (SCE&G)
Contractor: Barnard Construction
Area: 650,000 sqft
The Prime Contractor for
the dam remediation, Barnard Construction Company, Inc. of
Bozeman Montana, chose SSL to develop a 650,000 square foot
precast concrete panel facing system for the upstream and
downstream facing. The panel facing system served as a means
to construct the RCC Dam as well as to present an architectural
simulated rock façade for the upstream side.
View
PDF to learn more >
|

|